![]() ![]() “Perangkat Lunak JIT (Just In Time) untuk Memprediksi Resiko Proyek Perangkat Lunak”, Jurnal Sistem Informasi Universitas Kristen Maranatha, Volume 4 Nomor 1 Maret 2009. Thesis, Department of Computer Science and Engineering, Hensinki University of Technology, Finland, 2001. “Software Engineering Risk Management: A Method, Improvement Framework, and Empirical Evaluation”. ![]() “Software Engineering Risk and Just-In-Timeĭevelopment”, International Journal of Computer Science and Software Engineering Risk Management, IEEE Computer Society Press, Los Alamitos, CA, USA. “Software Risk Management”, Technical Report, Report # CMU/SEI-96-TR-012, Software Engineering Institute, Carnegie Mellon University, Pittsburgh, PA, USA. Managing Risk: Methods for Software Systems Development, Addison-Wesley, Reading, U.K. “Source-Based Software Risk Assessment”, Proceedings of the 2003 International Conference on Software Maintenance, Amsterdam, Netherlands. “A Collaborative Spiral Software Process Model Based on Theory W”, Proceedings of the 1994 International Conference on Software Process, IEEE Computer Society, Washington.ĭeursen, A. 1991.”Software Risk Management: Principles and Practices”, IEEE Software, 8(1):32-41. “A Spiral Model of Software Development and Enhancement”, Computer, May, 61-72.īoehm, B. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |